沙雕歷程時間軸
Schedule of the sand sculpture event
板模堆沙作業開始
3/1 Begin to pile the sand on the plate.
完成地形勘驗後,挖土機進駐福隆海水
3/15 浴場,開始挖沙,整地、打地基等作業。
After inspecting the area, the excavator
begins to dig the sand, prepare the ground,
and lay the foundations.
大型沙雕作已大致堆作完成。
4/12 Block large sand heap.
各國沙雕師團隊陸續抵臺進行沙雕創作。
4/20 Sand sculpting masters from different
countries arrive in Taiwan and start to work
on the sand.
於交通部觀光局旅遊服務中心舉辦沙
4/20 雕記者會 。
A press conference is held at the Tourist
Information Center, Tourism Bureau, MOTC.
於沙雕會場舉辦「開雕祈福儀式」,邀請
5/4 法師主持灑淨儀式,以求本活動平安順利。
An ‘Opening praying ceremony’ is held to
pray for a successful event.
30 金沙榮耀.福隆國際沙雕藝術季